Key Project Facts
Client: RPG (formerly CEG)
Location: Langford Bridge, Kingskerswell Road, Newton Abbot
Development: Mixed-use development for up to 450 dwellings, employment and local centre uses
Services: Promoter’s agent, sales pack preparation, technical coordination, disposal support, post-sale monitoring
Project Overview
Hawksmoor acted for RPG (formerly CEG) as promoter’s agent in the preparation of a detailed sales information pack for the sale of the residential element of the Langford Bridge scheme at Kingskerswell Road, Newton Abbot.
The wider planning permission included up to 450 dwellings, up to 22,000 sqm of employment space and 279 sqm of local centre uses, with the employment and local centre land retained by the landowner. Hawksmoor’s role was to support the disposal of the residential parcel while ensuring that the infrastructure strategy properly reflected the needs of both the land being sold and the retained land.
Role of Hawksmoor
Acting on behalf of the promoter, Hawksmoor coordinated the preparation of a comprehensive technical sales pack to support the marketing and sale of the residential element of the consented scheme.
A key complexity was that the residential foul and surface water drainage outfalls needed to pass through retained land, including the retained employment land, before connecting into the wider network. This meant the infrastructure design needed to accommodate not only the residential development being sold, but also provide suitable capacity for the retained employment and local centre uses.
Hawksmoor therefore coordinated the preparation of a detailed technical pack which:
- Defined the infrastructure works to be undertaken by the purchaser through the retained land
- Established how the foul and surface water drainage strategy would serve both the residential parcel and the retained land
- Ensured sufficient access and services capacity was provided to support the future delivery of the employment and local centre uses
This information formed a key part of the disposal process and helped ensure that purchasers were able to assess the residential opportunity on a clear and informed basis.
Outcome
- Preparation of a detailed sales information pack for the sale of the residential element of the Langford Bridge scheme
- Clear technical strategy established for foul and surface water drainage outfalls through retained land
- Successful sale of the residential parcel to Persimmon Homes
- Hawksmoor remains involved in monitoring Persimmon’s contractual obligations to deliver the infrastructure required to support the retained land